免费在线观看在线-爱爱视频免费-成人福利视频导航-天天干夜夜做-精品久久久av-中文日韩在线-国产一级做a爱片在线看免-午夜精品一二区-激情久久网站-亚洲精品男女-欧美性天天-黄色裸体视频-av无限看-久久666-五月婷婷社区-亚洲欧洲中文日韩久久av乱码-中文字幕一区在线

Shenzhen great tower Industrial Co., Ltd.

Advantages and daily use of filters

Views: Update time:2020-11-06

Ensure that the pneumatic diaphragm pump is always in good operation or standby state. Domestic pneumatic diaphragm pump, fire pump, spray pump, booster pump, sewage pump and air conditioner pneumatic diaphragm pump are installed in all buildings. The maintenance personnel of the management department are responsible for the regular maintenance of the pneumatic diaphragm pump.


1、 Daily inspection and maintenance shall be carried out once a week for domestic pneumatic diaphragm pump and air conditioner pneumatic diaphragm pump, and comprehensive maintenance shall be conducted once every six months.

2、 The fire pneumatic diaphragm pump and spray pump shall be put into trial operation once a month, and the booster pump shall be operated every two months for 10-15 minutes. When the fire pump is started, the test fire hydrant outlet water spray range at the top of the pipe network shall be more than 6m, and the comprehensive maintenance shall be conducted once every half a year.

3. Check packing sealing condition, if there is water leakage, add or replace asbestos rope packing.

4. If the coupling bolts and rubber pads are damaged, they should be replaced.

5. Tighten the frame screw and do rust proof treatment.

6. Due to the frequent operation of domestic pneumatic diaphragm pump and air conditioner pneumatic diaphragm pump, the bearings at both ends of the coupling should be removed every year for cleaning or replacement.

6、 Motor maintenance

1. The appearance inspection shall be neat, the name plate shall be in good condition, and the grounding wire shall be well connected.

2. Remove the wire connecting piece in the motor junction box, and use a 500V megohmmeter to test the insulation resistance of the motor winding between phase to phase and phase to ground, which should not be less than 0.5 megohm.

3. The three-phase conductor and connecting piece in the motor junction box shall be firm and tight.

7、 Maintenance of related valves, pipes and accessories

1. The opening and closing of each valve shall be flexible and reliable without leakage inside and outside.

2. The action of one-way valve shall be flexible and there shall be no water leakage inside and outside the valve body.

3. The indication of pressure gauge is accurate and the dial is clear.

4. The appearance of pipes and accessories shall be neat and beautiful without cracks, and the paint shall be complete without falling off.

5. Inching to judge whether the pneumatic diaphragm pump steering is correct, if there is any error, it should be corrected.


Address:402, building 27, Dafa Industrial Zone, Longxi community, Longgang street, Longgang District, Shenzhen City, Guangdong Province

Copyright ? 2021 Shenzhen great tower Industrial Co., Ltd. all rights reserved

粵ICP備2020110751號

吴桥县| 龙山县| 岳普湖县| 五河县| 襄城县| 抚松县| 扶风县| 新安县| 门头沟区| 万州区| 清水河县| 平昌县| 集贤县| 杭锦后旗| 福贡县| 东辽县| 临颍县| 盐亭县| 宁夏| 河东区| 闽侯县| 方城县| 清涧县| 盘锦市| 永春县| 象州县| 微博| 乌鲁木齐市| 罗甸县| 手机| 巴楚县| 滦南县| 隆尧县| 抚宁县| 宁蒗| 北宁市| 阳曲县| 克什克腾旗| 河南省| 天等县| 株洲市|